Construction Details

Garibaldi – San Siro section

Il pozzo di attacco per lo scavo dellla galleria naturale san antonio

The San Antonio Tunnel between the stations Monumentale and Garibaldi Here are the construction details..

Scudo e Testa rotante della talpa assemblati

Assembling the TBM. View photos.

metro5 tbm (7)

The TBM (Tunnel Boring Machine). Here are the photos of its operation.

Solaio a quota banchina e selle di scorrimento talpa

The Gerusalemme station. Take a look at its history.

standardPostTransition
Perhaps the network unstable, please click refresh page.